2021 Operating Information:
The PCCRC is proud to be part of a grower's community working to raise products, which are consumed throughout the world. We look forward to helping make the 2021 harvest as productive as possible.
The normal water run will go from May 1 to September 30th, annually. The current 2021 Water Allotment is XX inches. No allotment changes have been announced since the last Board Meeting.
The company requires 72 hours notice to have water turned on and 48 hour notice to turn water off. The ditchriders' contact numbers are posted on our home page. If you are unable to reach your ditchrider directly, feel free to call the office at 279-3315 to place your order.
The following prohibited activities may result in shut-off of water for the year:
1) Verbal or physical abuse towards any employee;
2) Tampering with turnouts or checks; and/or
3) Any theft of water
Copyright © 2021 Pondera Canal and Reservoir Company - All Rights Reserved.
Powered by GoDaddy